Wigan & Leigh College - Summer works including New Performing Arts Centre
Rise supply partner Greenmount Projects have successfully completed and handed over numerous projects to client Wigan & Leigh College, including a new performing arts space within the college’s Parsons Walk Campus. Greenmount Projects were appointed to carry out the works via Rise and commenced on site in May 2023.
Other works carried out by Greenmount for Wigan & Leigh College, procured through Rise included; the fit out of a virtual reality cave and the reconfiguration of the institution of technology, the learning resources centre and brick and plastering workshop.
Greenmount Projects is a Lancashire-based contracting company specialising in a range of services, including design, fit-out, refurbishment, and furniture solutions.
New Performing Arts Centre
This project took place at the college’s Parsons Walk Campus, the package of works included new build and demolition works in order to convert the College Centre into a Performing Arts Centre. The new centre was built to house the following college facilities;
- Performing Arts Theatre
- Dance Studio
- Music Rehearsal/Recording Studio
- TV Green Room
Virtual Reality Cave
This project took place on the College’s Centre for Advanced Technical Studies, and consisted of enabling and fit out works to the basement of the building. Providing the space for the college to install specialist equipment and create a Virtual Reality Cave
Brick/Plastering Workshop
This project took place on the College’s Pagefield Campus. Involving the reconfiguration of both brickwork and plastering workshops to create additional capacity.
Institute of Technology and Learning Resource Centre
This project also took place on the College’s Pagefield Campus and involved the reconfiguration and refurbishment of the curriculum areas and the learning resource centre, modernising the space and make room for new equipment.